This website uses cookies to ensure you get the best experience.
Learn more.
An Auto Scaling group uses a launch template. Operations creates a new template version with a patched AMI and configures the group to use it. Existing instances still run the old AMI. Which action performs a controlled replacement of the existing fleet?
Published
- Run a scheduled action that keeps desired capacity unchanged and assume existing instances adopt the new template.
- Delete the old AMI immediately and assume the group replaces instances because their AMI no longer exists.
- Wait for the launch-template update to alter the operating-system disk of every running instance in place.
- Start an instance refresh with the desired launch-template version and appropriate healthy-capacity and warmup settings.
Comments — 0
Sign in to comment