An original 50-question practice exam with explanations for every answer choice and Microsoft references. Suggested time: 100 minutes. Independent practice material; not an official Microsoft exam.

Questions — 50

  1. A company plans to migrate a large production SAP HANA database to Azure. What should establish the compute shortlist?
  2. A configured SAP monitoring provider stops delivering metrics. What should responders investigate first?
  3. A custom SAP VM image will be reused in production. What should the image process preserve?
  4. A customer runs RISE with SAP and wants an Azure integration service to communicate with the SAP-managed landscape. What must be agreed first?
  5. A database replica is healthy, but the disaster recovery region lacks application-server quota and DNS configuration. What is the correct assessment?
  6. A HANA backup design must support point-in-time recovery. What should be planned?
  7. A HANA backup policy is changed to reduce cost. What must be preserved?
  8. A HANA database requires a large memory footprint and predictable performance. Which compute choice is appropriate?
  9. A HANA high-availability design needs database-level replication between cluster nodes. Which technology is appropriate?
  10. A HANA storage design meets capacity requirements but falls short of required throughput. What should be reviewed?
  11. A migration includes a database platform change and a large data transfer. How should the team choose the migration approach?
  12. A migration rehearsal reveals orphaned jobs and broken interfaces after application startup. What should change before production?
  13. A migration team needs to deploy SAP infrastructure, but should not manage identities across the tenant. Which access approach fits?
  14. A planned SAP patch cycle includes database and application-server maintenance. What is the best operational approach?
  15. A recovery plan defines an RPO of 15 minutes and an RTO of two hours. What do these constrain?
  16. A RISE integration design uses private addressing between separately managed environments. Which TWO checks are necessary? Select TWO.
  17. A selected SAP VM family is available in a region, but deployment fails because the subscription lacks sufficient regional vCPU quota. What should happen before the migration window?
  18. A supported production SAP VM runs continuously with predictable demand. Which purchase model should be evaluated for savings?
  19. A target SAP architecture depends on a specific VM, OS, and database combination. What is the best supportability check?
  20. A team plans an isolated disaster recovery test. Which TWO outcomes should it verify? Select TWO.
  21. A team proposes enabling a disk cache mode uniformly on every HANA volume. What is the correct approach?
  22. A two-node SAP cluster must avoid both nodes acting as primary during a partition. What is a key requirement?
  23. Administrators want centralized Azure visibility and supported management operations for an SAP system. Which capability should they assess?
  24. An application server is idle outside business hours. What should precede an automated shutdown schedule?
  25. An architect considers Write Accelerator for SAP database log disks. What should govern its use?
  26. An enterprise needs private connectivity from its datacenter to Azure for SAP workloads. Which service should it assess?
  27. An enterprise owns SAP and operating-system licenses. What should the migration cost plan do?
  28. An on-premises SAP system must move with minimal application change, and its current supported database remains suitable. Which strategy best matches the requirement?
  29. An organization repeatedly deploys similar SAP landscapes. What improves consistency and reduces manual configuration drift?
  30. An SAP design uses Azure NetApp Files. What must sizing consider beyond provisioned capacity?
  31. An SAP disaster recovery plan uses Site Recovery for supported application servers and database-native replication for the database. What must the runbook coordinate?
  32. An SAP landing zone must prevent new resources in unapproved regions. Which control addresses this requirement?
  33. An SAP workload is distributed across availability zones. What should be validated before accepting the design?
  34. Application and database subnets are separated. Which network design best protects the database while preserving SAP communication?
  35. Azure Advisor recommends rightsizing a production SAP VM. What should happen before the change?
  36. Backups have completed successfully for months. Which action most directly verifies recoverability?
  37. Closely coupled SAP tiers require low inter-VM latency. Which placement feature can help, subject to capacity and availability design?
  38. Historical business data increases HANA memory and backup costs. Which optimization should be assessed with the SAP application owners?
  39. Operations needs SAP-specific monitoring alongside infrastructure metrics. Which service should it evaluate?
  40. SAP application servers intermittently fail to reach a database subnet. Which Azure toolset helps investigate connectivity and network configuration?
  41. SAP backup traffic must reach a supported storage service through a private address. What must accompany a private endpoint?
  42. SAP Central Services must remain available after a node failure. What should the architecture include?
  43. SAP database disks contain regulated information. Which approach best addresses encryption requirements?
  44. SAP infrastructure is defined in Bicep. Which practice best supports controlled environment differences?
  45. SAP response time worsens after data growth. How should the team identify the infrastructure bottleneck?
  46. Several SAP landscapes need consistent governance and separated production access. Which foundation is appropriate?
  47. Supported SAP VMs require low network latency and reduced CPU overhead for packet processing. Which feature should be evaluated?
  48. The business permits a four-hour production outage. What most directly validates the proposed cutover plan?
  49. The business requires recovery after an Azure regional outage. Which approach addresses that scope?
  50. The migration design needs an accurate cost estimate. Which inputs are most appropriate?