A control is documented as enabled, but tests show it fails for one production path. What should residual-risk analysis use?
Published
- The number of staff trained on the product only
- The actual coverage and demonstrated effectiveness
- The vendor's maximum advertised performance
- The control's design description as conclusive evidence