An operations team needs evidence of allowed and rejected network flows for a VCN investigation. Which telemetry should it evaluate?

Published
  1. A saved screenshot of the network diagram.
  2. Only the application's monthly cost allocation report.
  3. Only Audit events for IAM policy creation.
  4. VCN Flow Logs with the required capture and log configuration.

Comments — 0