A job run is interrupted after saving an expensive intermediate result. What design can reduce wasted work on retry?

Published
  1. Treat an incomplete model file as a verified final model
  2. Store all progress only in process memory
  3. Durable checkpoints with validated resume behavior
  4. Always delete all outputs before examining the failure

Comments — 0