A feature passes its technical tests but fails a stakeholder-agreed acceptance scenario. What should the analyst conclude?
Published
- The requirement's acceptance has not yet been demonstrated
- The stakeholder must change the criterion without discussion
- The feature must be accepted because code compiles
- The traceability matrix should hide the failed result