A team repeatedly repairs the same defect after final inspection. Which improvement best addresses prevention?

Published
  1. Increase final inspection without examining the source
  2. Lower the acceptance standard to match the defect
  3. Report repaired defects as additional delivered features
  4. Analyze and correct the process that introduces the defect

Comments — 0